Skip to content

Adapting the packer to the alternative P&R #603

Adapting the packer to the alternative P&R

Adapting the packer to the alternative P&R #603

Triggered via pull request July 27, 2023 07:18
@yrabbityrabbit
synchronize #184
yrabbit:h-wip
Status Cancelled
Total duration 1m 7s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

chipdb.yml

on: pull_request
Matrix: example
Fit to window
Zoom out
Zoom in

Annotations

16 errors
gw1ns2
The run was canceled by @yrabbit.
gw1ns2
The operation was canceled.
gw1n4
The run was canceled by @yrabbit.
gw1n4
The operation was canceled.
gw1nz1
The run was canceled by @yrabbit.
gw1nz1
The operation was canceled.
gw1ns4
The run was canceled by @yrabbit.
gw1ns4
The operation was canceled.
gw1n9
The run was canceled by @yrabbit.
gw1n9
The operation was canceled.
gw1n1
The run was canceled by @yrabbit.
gw1n1
The operation was canceled.
gw2a18
The run was canceled by @yrabbit.
gw2a18
The operation was canceled.
gw1n9c
The run was canceled by @yrabbit.
gw1n9c
The operation was canceled.